Gran Spot and Gran Sky - Econ
The Gran Spot and Gran Sky projects involve two developments, each featuring a tower with 27 and 35 floors. The estimated demand for the administrative area is 338 kVA, while the demand for the apartments is 366 kVA, resulting in a total demand of 704 kVA. The electrical supply for the units is provided through a busbar system (BW). I was involved in all stages of the low-voltage electrical design. The project was developed in 2D using AutoCAD.